
H2UPSCALE
High-power hydrogen fuel cell system balance of plant component up-scale and optimization Abstact: Proton Exchange Membrane Fuel Cells are
High-power hydrogen fuel cell system balance of plant component up-scale and optimization Abstact: Proton Exchange Membrane Fuel Cells are
On 2–3 July in Bologna, Italy, the ActFast Kick-off Meeting marked the official start of the project’s collaborative efforts to
On 27–28 May, the SURFs Up consortium gathered for its 12-month meeting, hosted in a hybrid format at the VTT
From 6 to 8 May 2025, the SOLO project consortium came together in Lund, Sweden, for its Month 30 meeting,
On 11–12 June 2025, representatives from the twelve organisations that form the ZEST consortium gathered in Riga, Latvia, for the
On 11 December 2024, the SURFs UP consortium gathered in Tallinn, Estonia, for its 6-month project meeting, hosted by Fibenol.
Actions for Climate Transition by developing Future Aquaculture Strategies and Technologies Abstact: ActFast aims to identify, validate, and demonstrate climate
A training programme to promote the industrial adoption of microbial electrochemical technologies Abstract: TRAMPOLINe- is a joint academic-industrial interdisciplinary
High-performance circular and bio-based materials in the construction and building sector Abstract: The construction sector is the second largest
The Digital Innovation Hub of Catalonia (DIH4CAT) is a non-profit regional initiative dedicated to fostering innovation and accelerating the technological
Nature Based Smart Water Grids for Integrated water and drought management Abstact: WATERGRID’s objective is to develop and demonstrate
On 19–20 June 2025, the CROP-SAFE consortium convened in Sarpsborg, Norway, for the project’s official Kick-off Meeting. Coordinated by the
Integrated process for seawater electrolysis using a PGM-free anion exchange membrane stack Abstact: ASTERISK proposes integrating seawater treatment and green
On 8 and 9 July 2025, the FUELS‑C consortium—coordinated by Leitat—gathered for its Month 12 project meeting at FACSA facilities in Castelló
On June 17th and 18th, Leitat hosted the General Assembly of the EASIZERO project at our facilities in DFactory. During
Dynamic Abatement Strategies for maximized environmental and societal health in cities Abstact: Each year, pollution claims thousands of lives
Phone. (+34) 937 882 300
Utilitzem cookies per millorar la teva experiència de navegació, publicar anuncis o contingut personalitzats i analitzar el nostre trànsit. En fer clic a "Acceptar-ho tot", acceptes l'ús que fem de les cookies.