From 25 to 27 November, the 6th General Assembly took place in the LEITAT facilities. During the meeting, an overview of the status of the work packages under execution was done, with a specific focus on demonstrators, meaning that the project is entering its final stage. For this purpose, a short overview on tasks and deliverables of WP4 and a broader one on WP5 and WP6 activities were done. At the same time, the relation between WP4 and WP5 was tackled.

The second day was entirely devoted to Work Package 5. Detailed exhibitions of each pilot were performed, and later parallel sessions of each pilot were held to finalize the details of each one of them.


Finally, thanks to LEITAT were expressed for the great organization of the general assembly as well as the social events.